02 / WHAT TO KNOW
The room can look simple while the conversion is still unresolved
An open basement makes it easy to picture a kitchen against one wall, a bathroom in the corner, and a bedroom at the window. That picture is useful. It does not yet show whether those locations work together in the actual building.
The homeowner decision is whether to keep developing this basement into an independent dwelling, revise the layout, or consider a different use. Start with the constraints that could change that decision. A finish package cannot answer them.
03 / WHAT TO KNOW
Headroom is a finished-space question
The height to exposed framing is not the height left after the planned floor, ceiling, and service work. Measure the low points and study the proposed assemblies together. A duct route chosen later can consume space that the layout depended on.
Seattle Residential Code Section R305 addresses ceiling height and has different provisions for spaces and obstructions. Confirm the applicable code path and any existing-building provisions for the property with the responsible designer and jurisdiction; one measurement is not a compliance finding.
The practical consequence: if a proposed room depends on moving a low obstruction, identify what that move involves before treating the room as settled. Do not assume a beam or service can simply be removed.
04 / WHAT TO KNOW
A bedroom location depends on more than where a bed fits
Seattle Residential Code Section R310 addresses emergency escape and rescue openings, including basement sleeping rooms, with exceptions. Have the proposed room and exterior conditions checked together rather than assuming an existing small window is adequate.
In a conceptual layout, putting the bedroom beside a window is easy. In the actual property, the opening, exterior access conditions, nearby structures, and any proposed work need review. If the room must move, its relationship to the kitchen, bathroom, entry, and remaining living area changes too.
05 / WHAT TO KNOW
A short-looking pipe route may change the room plan
Ask the plumbing contractor to establish how the proposed bathroom and kitchen would connect to the actual drainage and water systems. A nearby pipe does not establish that it serves the proposed fixture arrangement. Identify any investigation or specialist design needed before pricing the route as known.
Do the same coordination for electrical work, heating, ventilation, and any shared equipment that must remain accessible. These are scope questions for the actual conversion, not a claim that every basement needs a new panel, pump, or heating system.
Keep a reported water or dampness problem open until its source and response are understood. EPA guidance emphasizes fixing the water problem when addressing mold. New finishes should not be used to hide an unresolved condition.
06 / WHAT TO KNOW
One constraint can create a chain of work
Hypothetical example: a homeowner sketches a bedroom beneath a low duct and puts the bathroom on the opposite side of the basement. The team has not confirmed whether the duct can move or how the new bathroom will drain.
If the duct stays, the bedroom may need a different location. That alternative needs its own opening and exterior review. If the bathroom also moves, the kitchen and circulation may need to shift. The result can be a materially different scope even though the basement footprint never changed.
The useful planning output is a comparison: what can stay, what each option requires changing, what remains unverified, and who will resolve it. That is more useful than decorating a layout whose controlling assumptions are still open. This example describes dependencies, not a specific property or a recommended construction method.
07 / WHAT TO KNOW
Ask what the conversion price assumes
When reviewing a proposal, ask the team to separate the dwelling work from the work needed to make the existing shell suitable for that plan. Identify unresolved conditions explicitly and explain how they affect the pricing basis.
For Seattle projects, SDCI says remodeling to add an attached or detached ADU requires a building permit. Its addition-or-alteration guidance distinguishes adding a dwelling unit from simpler alterations. Confirm the actual review requirements for the project; Seattle guidance should not be applied as another city's rule.
Ask the designer to identify the applicable separation, alarm, and other life-safety provisions for this particular building as well. Do not assume the requirements from a different conversion apply unchanged.
Useful proposal questions include: which ceiling and opening conditions are verified; what utility work is included; what moisture investigation is unresolved; and which design, permit, specialist, and corrective tasks are excluded or carried as assumptions. These questions expose the work behind the number without inventing a universal conversion price.
08 / WHAT TO KNOW
How NABS approaches the service
NABS Brothers offers basement conversions and ADU remodeling. We connect the intended use to existing conditions, layout, trade coordination, and the required design, engineering, and permit input within the agreed scope. This is a description of our service approach, not a claim that the illustrated apartment has been built or approved.
For an early idea, the Home Project Review provides a way to organize one property and one primary project question. Bring the intended use, available records, and known concerns. The next useful decision is which questions need investigation before you commit further to the layout and construction scope.